Free reorder point calculator
Know when to reorder stock and how much: reorder point, safety stock, days of stock left and the economic order quantity for one product, or a stock plan for your whole product list.
Used for stock values and ordering costs.
Plan your whole product list
Add products or paste rows from a spreadsheet (name, stock on hand, average daily sales, highest daily sales, lead time, longest lead time, unit cost). We sort them by what to order first.
Get your stock plan
Confirm your email to see every product sorted by what to order first, with the quantity and the value of each order.
- Reorder point and safety stock for every product
- What to order now and this week, sorted by urgency
- How much to order and what it costs
- A CSV download and a copy by email
Showing the full result for . This browser is remembered, so next time it opens straight away.
How the reorder point is worked out
The reorder point is the stock you will sell while you wait for a delivery, plus a cushion. With 10 sales a day and a 7-day lead time, you sell 70 units before new stock arrives. Safety stock covers the days when sales jump or the delivery is late: if your busiest day is 16 and the slowest delivery took 10 days, the worst case is 160 units, so the safety stock is 160 minus 70, or 90, and the reorder point is 160.
Running out costs more than the lost sale: ads keep spending on a product you cannot ship, marketplaces push listings down, and customers go elsewhere. Too much stock ties up cash instead. A reorder point for every product, checked against stock each week, avoids both.
Getting the numbers right
- Use real lead times from your last few orders, including shipping and customs, not the supplier's quote.
- Leave out one-off spikes such as a viral post when you pick the busiest day, unless you expect it again.
- Recalculate before peak season, when both sales and lead times go up.
Know your margins too: see what each product earns with the profit margin calculator, and what each order really leaves after costs with the store profit calculator.
Questions
What is a reorder point?
The stock level at which you place a new order, so it arrives before you run out. It is the stock you sell while waiting for a delivery, plus safety stock for busy days and late deliveries. For a product that sells 10 a day with a 7-day lead time and 30 units of safety stock, the reorder point is 100.
How do you calculate safety stock?
The simplest reliable way uses your extremes: highest daily sales times the longest lead time, minus average daily sales times the average lead time. If you know how much daily sales vary, the service level method multiplies that variation by a factor for how rarely you are willing to run out (1.65 for 95% of the time) and by the square root of the lead time.
What is lead time?
The days from placing an order to having the stock ready to sell: the supplier's production or picking time, shipping, customs and checking it in. Use what actually happens, not what the supplier promises, and take the longest lead time from the last few orders.
What is the economic order quantity?
The order size that keeps the total of ordering costs and storage costs lowest. It is the square root of (2 x yearly demand x cost per order / yearly cost of holding one unit). Treat it as a guide; minimum order quantities and price breaks often matter more.
How often should I check reorder points?
Recalculate whenever sales or lead times change: before peak season, after a promotion, or when you switch suppliers. Checking the whole list once a month catches most problems before they turn into stockouts.
Growing faster than your stock?
We build stores with inventory, supplier and reorder tools built in, connected to your marketplaces, so stock and sales stay in step.